The Slabs Are Pouring
Two slabs are poured at The Roundabout, and the next three are lined up right behind them.
So don’t be surprised when you drive by and see steel going up on those slabs. We’ll be going vertical in the next week or so.
For the last four months, most of the work has happened underground, where nobody gets to see it. Drainage is installed. Power and utility lines are in. Sewer and plumbing are done. It’s the part of a project that takes the most time, costs real money, and from the road looks a lot like moving dirt around. (Trust us, there was plenty going on down there.)
Now you get to see what those four months actually produced.
This is where it starts getting fun to watch. Our team has enjoyed every step of the way, dirt included. But when things go vertical, you can feel the momentum.
Next time you’re on FM 967, slow down and take a look. We’ll keep posting progress here as the buildings take shape.